Translate

Friday, March 19, 2010

Sandblasting the Frame - Day One

This post includes a video. Be sure to push the play button. 


 4 hours and 300 pounds of sand completed 1/3 of the frame. A good 30 minutes and 50 lbs. of sand was used trying to find the proper air volume and sand flow.


The base metal and welds look real good. These 2 holes will be repaired soon.



This A frame cleaned up nicely. All suspension components will be removed then detailed inside the sandblasting box.

Sunday, March 14, 2010

Rolling Chassis Restoration

This is a video, be sure to push the triangle to play.