This post includes a video. Be sure to push the play button.
4 hours and 300 pounds of sand completed 1/3 of the frame. A good 30 minutes and 50 lbs. of sand was used trying to find the proper air volume and sand flow.
The base metal and welds look real good. These 2 holes will be repaired soon.
This A frame cleaned up nicely. All suspension components will be removed then detailed inside the sandblasting box.